Friends
Topics |
House Reconstruction2011-07-30 Slab of concrete in floor, old copper base perhaps?
2011-07-31 Brick foundation with concrete cap, arch of bricks, and several layers removed
2011-08-02 Temporary support for load bearing room, with beam being prepared
2011-08-03 Beam in place and open rooms
2011-08-06 Fixture marks in wallpaper, unknown purpose, laundry with part of ceiling and wall lining removed
2011-08-07 Porch with lining being removed, ceiling of rear room, showing signs of old vents and structures, view of house exterior, hallway fully stripped back to sarking and floorboards
2011-08-08 New kitchen wall framing, beam and preparation for french windows
2011-08-09 Window gone
2011-08-11 More kitchen laundry wall
2011-08-14 Old kitchen, linoleum brand
2011-08-31 Preparing for french window, note gib lining
2011-09-10 Laundry with replacement recycled floor, and new south wall, hallway and kitchen showing gib and stopping
2011-09-17 New replica sash window, french doors, laundry, and back door
2011-09-30 Floor ready for sanding and varnishing
2011-10-08 Tiles under old kitchen linoleum, work in old kitchen, new kitchen painted with skylight
2011-10-10 New kitchen being installed
2011-10-15 Last of the old kitchen
2011-02-22 New bedroom painted and ready to go
|
tahi Page last modified on 2012 Apr 24 13:33
Edit - History - Recent Changes - WikiHelp - Search - email page as link -> mailto:?Subject="KiwiWiki: House Reconstruction"&Body=